Services Provided: Road/Bridge Design, Geotechnical Design, Flood Plain Analysis (to include fill mitigation and detention design), Hydrologic & Hydraulic Modeling, Drainage Design, Green...
Transportation
Search Atlas Website
PORT OF OAKLAND – OAKLAND AIRPORT POST-EARTHQUAKE RUNWAY REPAIRS
Consolidated Engineering Laboratories (CEL), an Atlas company, mobilized its pavement management staff and provided analysis of existing pavement in the immediate aftermath of the October 1989 Loma...
GDOT NORTHWEST CORRIDOR TRANSPORTATION IMPROVEMENTS
The lanes will be managed by dynamic priced tolling, allowing drivers to choose to pay a toll to bypass congestion. To maximize benefit for all travelers of the corridor, these express lanes will be...
HARBOR BRIDGE
The new bridge design incorporates a number of aesthetic features including a shared-use path, a community plaza, nighttime LED lighting, and xeriscape landscaping. In all, the Texas Department of...
BART OAKLAND AIRPORT CONNECTOR PROJECT
Atlas was recently awarded the material testing and special inspection services for the OAC project. The project is the construction of an Automated Guide way Transit (AGT) system between the...
GOLDEN GATE BRIDGE
Atlas has provided quality control and materials testing services on three separate contracts nearly continuous over the past thirteen years working on both anchorages. Services included the...
UTA TRAX LIGHT RAIL UNIVERSITY EXTENSION
This Expansion of the Salt Lake Valley Light Rail System owned and operated by the Utah Transit Authority started at the fourth south intersection and continued up east to the Rice Eccles Stadium...
BART BERRYESSA EXTENSION
BART Berryessa Extension adds 16 miles of heavy rail from the Warms Springs Station in South Fremont to the Berryessa Station in South San Jose. The project consisting of realigning utility and...
SAN FRANCISCO INTERNATIONAL AIRPORT – TERMINAL 2
Atlas provided quality assurance services for the San Francisco International Airport (SFO) Terminal 2 Boarding Area D Renovation and Expansion, a $388 million-dollar project. Working with T2...
14TH STREET BRIDGE
This project consisted of widening approximately 2 miles of 14th Street in midtown Atlanta, as well as the relocation of Williams Street and the inclusion of a new ramp to 17th Street. This project...