CROCKER ART MUSEUM

Located in downtown Sacramento, this 125,000 sq. ft expansion to The Crocker Art Museum building tripled its size. This new addition also encompasses a 260 seat auditorium, a café, 7,000 sf courtyard, and loading dock with a large-capacity freight elevator to better handle art and exhibits.

  • Scope of services include reinforced concrete placement and sampling, shop welding inspections, field welding inspections, non-destructive testing, high strength bolting, anchor and dowel installations, proof load testing, fireproofing, and masonry inspection.
  • Provided roof inspection during built-up roof application.
  • Structural steel fabrication in Idaho.

DURATION: 2008 – 2009
CONSTRUCTION COST: $262M

Client

CROCKER ART MUSEUM

Location

Sacramento, California

Markets

Services